Oracle Primavera Unifier funziona su iOS.
Licenza: | Freeware |
Data di inserimento: | 12/05/2024 |
Editore: | Oracle America, Inc. |
Cambia Log |
• Ability to refresh the business process(s) when changes are made to setup, design and configuration at server side. • Technical improvements and bug fixes. |